Follow Us!
Facebook Like button
Shop Garden Decor
Shop Garden Accent Heaven
Follow Us On Twitter
  • Follow Garden Accent Heaven
Follow Us On Twitter!
    Garden Blogs
    Pages
    Garden/Bird Topics
    Archives

    Linda’s New Fence – Landscaping

    We had 5 evergreen trees growing on the property line between our house and the one next door. They had been planted by the builder when the houses where constructed about 12 years ago. They had grown to be 60 feet tall and where still growing. This type of tree grows to be 120 feet tall when fully grown. They where becoming a hazard in high winds and they where blocking much of the sun from Linda’s Serenity Garden. They had to be removed.

    Fence1Once the trees where removed we now had great sun down the south side of the house for the first time since we lived here, but the yard was now open to the one next door which did not set the flower garden that is our back yard off very good. Linda wanted a fence built to draw the eye back to here Serenity Garden.

    I first built a short 10 foot fence from the house wall to the walkway that wouldFence2 hide the propane tanks that where now in view since we had the shrubs removed along the side of the house when the trees where being removed.  Lining up the 6ft ceder fence boards here was easy. I put a 2″ X 4″ board on the ground, got it level and just put the fence fence boards on top of it. For the time being until I can build arbor I put a wrought iron arbor we purchased in the entry way.

    Down the side of the property line where the trees had been removed we added garden composted soil to the ground which made the ground a bit higher. I wanted to keep the fence about 9″ above the ground so none of the soil would touch it and rot it’s boards. The ground also has a slope to the rear of the property so just laying a board on the ground was not an option.

    Fence Jig

    Fence Jig

    To line up my fence boards from the top I built a jig. I took a 2″ x 4″ board and screwed a 1″ X 8″ board on top of this. I was then able to sit this on top of the 2″X4″ treated board, put two nails in place to hold it and line up my fence boards from the top of the fence instead of the bottom. To give the fence some character I made a patten with the boards where I spaced the boards on both sides of the fence. The 1″ X8″ allowed me to work on both sides of the fence.

    The fence was a two weekend project. The first weekend was a Sunday

    Under construction with jig in place

    Under construction with jig in place

    afternoon putting the posts into the ground about 18″ deep and setting them with concrete. Since this is the Pacific Northwest and as soon as I got the fence posts in place and the concrete poured it just had to start to rain. We took 30 quart trash bags and used them to covered up the newly poured cement, throwing shovels of dirt on top of  them to hold them in place to let the concrete set up.  The following Saturday was spent actually constructing the fence.





    Tinkerbell Personal Checks |Garden Planters | Jewellery For Women | Best Dog Foods | Budget Wedding Gowns | Shop For Jewellery | Vintage Jewellery| Diamante Jewellery | Car Finance Credit | DoorStep Loans